News

Go back to news listing

Starmine Suspension Bridge - Berm Construction Closure

Posted on Sep. 3 2025

The Town of Drumheller wishes to advise residents and visitors of the following: 

  • The parking lot at the Starmine Suspension Bridge will be closed from September 15, 2025, to November 21, 2025. 
  • Access to the bridge will be unavailable during this period. 
  • Construction crews will be mobilizing in the area to build a flood berm, which includes a removable flood gate along the bridge pathway. 
  • Improvements will be made to the day-use area that include: 
    • Upgraded pathways to meet accessibility standards 
    • Concrete Plaza to highlight the entrance of the Suspension Bridge 
    • Formal designated picnic areas  
    • Enhanced planting areas 

The project is being completed by Pidherny’s LTD, as part of the Town’s ongoing Resilience and Flood Mitigation Program. For questions or more information, please contact: Drumheller Resilience and Flood Mitigation Program floodreadiness@drumheller.ca or at 403-823-4878.

Prev

Recent News

I Want To